Click For Disaster Recovery 24/7 365 SupportCall 0800 86 000 86

Skip to main content
J&P CapacitorsIntelligent Solutions for Power
Menu
  • Services
    • 11kV
    • 33kV
    • Transformer Testing
    • High Voltage Services
    • Distribution Transformers
    • Switchgear Systems
    • Diesel Generator Solutions
    • Circuit Protection
    • Power Factor Correction
    • Voltage Optimisation
    • Applied Power Services
  • Projects
  • About Us
  • Contact Us
  • Phone 0800 86 000 86
  • Phone
  • Email

A client saving of over £90,000 per annum

Semi Conductor Manufacturer

Our client is a pioneer and world leader in advanced power management technology, from digital, analog and mixed-signal ICs to advanced circuit devices, power systems and components.

The world’s leading manufacturers of computers, appliances, automobiles, consumer electronics and defense systems rely on the technology to drive the performance and efficiency of their products. Today, power management technology plays a more important role than ever in saving the world’s dwindling energy reserves while tackling tough technology roadblocks.

The Challenge

Our clients power factor sat at 0.65 across 11 transformer incomers. However, due to modern loads and harmonics the existing inoperable standard type power factor correction could not just be renewed within the existing confines of the main switchboards. Our challenge was to upgrade the power factor correction to detuned, which meant the inclusion of filter reactors in series with the capacitors. The problem presented at this site was that there was no available space for the reactors, therefore, a complete redesign was required as there was no room in the substations for new standalone power factor correction.

The Solution

Johnson & Phillips won this project based on our ability to engineer the solution within the existing parameters of the space available to us. We installed over 6,000 kVAr of detuned power factor correction. We mounted the new filter reactors where the capacitors were once sited, fitted new capacitors in fan-cooled enclosures which were mounted on top of the main switchboards. To protect the capacitors and the reactors we fused the cabling between the capacitors and the reactors for additional protection. The complete system was ventilated and forced air cooled to allow the maximum air flow.

The Results

  • A client saving of over £90,000 per annum.
  • The elimination of £3,500 per month Reactive Power Charges.
  • Improved power factor from 0.65 to 0.99.
  • More maintainable system with complete access to capacitors and components.
  • Reduction in Climate Charge Levy.
  • Significant Reduction in Carbon Emissions.
  • Next
  • CHAS
  • Safecontractor
  • Made in the UK
  • Carbon Trust
  • Finning Cat
  • Delta
  • Construction Line Logo

View Our RHA Conditions

© 2021 Johnson & Phillips (Capacitors) Limited. All rights reserved.
Johnson & Phillips (Capacitors) Limited, Agincourt Street Works, Newport, NP20 5JN.

All materials, including text and images, published on this website remain the copyright of Johnson & Phillips (Capacitors) Limited and are protected under copyright law & copy 2021. You may not, except with our express written permission, distribute or commercially exploit the content.

Modern Slavery Act | Policies | Social | News

  • Follow us:
  • Twitter
  • LinkedIn
  • Instagram